ABSTRACT
The Plan–Do–Check–Act (PDCA) cycle, widely
recognized as the Deming process, has long served as a foundational framework
for continuous improvement and project management since its formalization and
widespread adoption in the 1950s. Despite its extensive application across
industries, increasing complexity in contemporary project environments has
highlighted limitations in its relatively simplified structure, particularly in
differentiating between planning validation, execution oversight, and
evaluative learning processes.
To address this gap, the (PRIME)² Framework,
developed by Yelna Yuristiary in 2026, is introduced as a dual-layer conceptual
model for enhancing project management and quality improvement systems. This
paper focuses specifically on the first layer, the PRIME cycle
(Plan–Review–Implement–Monitor–Evaluate), proposed as an extension of the PDCA
paradigm. The PRIME model introduces a distinct Review phase between planning
and implementation to strengthen pre-execution validation, while further
separating monitoring and evaluation functions to improve process clarity,
accountability, and feedback precision throughout the project lifecycle.
The PRIME cycle is not intended to replace
PDCA but to function as an evolutionary enhancement that increases structural
granularity in iterative project governance. Comparative conceptualization with
PDCA and DMAIC frameworks suggests that PRIME may offer improved suitability
for complex, dynamic, and high-stakes project environments where decision
accuracy and real-time control are critical. This study adopts a conceptual and
literature-based approach, supported by comparative diagrams and preliminary
analytical observations emphasizing the importance of structured review prior
to execution.
It is important to note that this paper
addresses only the first layer of the (PRIME)² Framework. The second layer,
which focuses on quality excellence dimensions, will be discussed in a separate
publication. Furthermore, the framework remains at a conceptual stage and has
not yet undergone full empirical validation, indicating the need for future
applied research and case-based testing.
Keywords: framework, process-cycle, project management,
quality management, review-process
ABSTRACT BOOK FROM 9th International Conference on Advanced Research in Management, Economics and Accounting available here!
No comments:
Post a Comment